Three-Phase Pad-Mounted Transformer

IEEE compliant and fluid-cooled. Engineered to provide high-capacity, reliable power for Data Centers and BESS expansions.

Lead Time 8 weeks Reference lead time 9 weeks Initial feasibility feedback within 24 hours
  • yun-sen Three Phase IEEE C57.12.34 Transformer units are explicitly engineered to withstand severe industrial motor inrush currents, high-density compute workloads, and the complex bi-directional power flows of BESS. Leveraging our authorized premium manufacturing network, we execute deliveries within 9 weeks while maintaining strict adherence to NEC and IEEE standards. Every unit is engineered as a DOE 2016 Compliant Pad-Mounted Transformer, ensuring full alignment with federal efficiency requirements. Available in capacities up to 10 MVA and equipped with holistic cULus official certifications (e.g., UL-CA-2228369-0), ensuring the equipment arrives on-site ready to drop in place and seamlessly pass Authority Having Jurisdiction (AHJ) inspections.
  • High-Efficiency & Energy SavingsConstructed with 100% pure copper windings and precision core architectures to strictly maintain a 65°C temperature rise. As a certified DOE 2016 Pad-Mounted Transformer platform, this design effectively minimizes energy losses during continuous, heavy-duty operational cycles, maximizing core efficiency and driving down the Total Cost of Ownership (TCO).
  • Rigorous Testing & Comprehensive CertificationAll high-capacity units undergo exhaustive 100% Factory Acceptance Testing (FAT). Equipment arrives at the job site bearing factory-applied NRTL compliance labels, effectively eliminating on-site regulatory risks.
  • Eco-Friendly & Fire-Resistant OptionsAvailable with an FR3™ natural ester dielectric fluid upgrade (KNAN/KNAF cooling). This high-fire-point fluid significantly enhances environmental safety and fire resistance while delivering exceptional overload capabilities.
Accelerate Data Center Operations

A deterministic delivery schedule ensures power infrastructure never bottlenecks server rack deployment, bringing your facility online faster.

Support BESS & Grid Interconnection

Engineered architectures specifically designed to handle solar and inverter harmonic distortion, providing critical step-up support for developers to meet their Power Purchase Agreement (PPA) deadlines.

Heavy-Duty Manufacturing Reliability

Over-engineered pure copper windings and superior Short-Circuit Current Ratings (SCCR) protect critical production lines from disruptive voltage sags.

Plug-and-Play Field Experience

Standardized with lifting lugs, external primary bushings, and pre-installed surge arresters to significantly simplify on-site integration and reduce contractor field labor cost

Three-Phase Pad-Mounted Transformer

Technical Specifications

PARAMETER VALUE
Capacity Range 400 kVA up to 10,000 kVA (10 MVA)
Primary Voltage 38.5kV, 13.8kV, 11kV (Custom voltage configurations available)
Secondary Voltage 12.47kV, 24.94kV, 2400V, 4160V (Low-Voltage steps: 208V, 240V, 440V, 480V, 600V)
Winding Material 100% Copper
Cooling Class & Temp Rise ONAN / ONAF
Temperature Rise Limit 65°C
Impedance 7% – 10.5%
Enclosure & Finish NEMA 3R rated, utilizing ANSI C57.12.28 compliant anti-corrosion coatings
Coating Standard ANSI C57.12.28 compliant anti-corrosion coatings
Official Certification Files UL-CA-2228369-0, UL-US-2402197-0, UL-US-2586027-0
Reference Dimensions 144 in (L) x 84 in (W) x 96 in (H)
Reference Weight 38,000 lbs (Fluid capacity: 1,200 gallons)
Lead Time & Warranty 9-Week Delivery
Warranty 36-Month Warranty
Interested in this product?

Dedicated Engineering Support

Powering high-load applications requires precise planning. Send your exact single-line diagram (SLD) to our heavy-power engineering team so we can confirm breaker coordination and compliance requirements.

Our team will respond within 24 hours.